wir unterstützen

Pump stations, forcemains, storm-water overflow and reservoirs as well as clarification plants, each of them must be monitored and controlled.

The disposal of sewage water is as important as the supply of drinking water. A consistent sewage treatment is not only be done by draining sewage water. High quality water treatment minimizes environmental pollution. Whether a central clarification plant is used or the sewage work will be done separately in smaller clarification plants, it is important that the sewage water will be collected and transported to treatment where it gets conditioned and cleaned. Finally it has to be refunded to the environment. Maintaining limits and effective management is inconceivable without the implementation of modern electrical engineering and measurement technology, combined with automation, telecontrol and process control engineering.

Our planning in all work phases, if necessary from acquisition of the actual state and preliminary planning to design engineering and detailed design to the preparation of specifications, ensures the conservation of values and security, both of new constructions and of the existence for the operating company.

Our service offer will be completed by building supervision and warranty management.

An effective and economic implementation of the user’s requirements based on the state of the technology will be given special emphasis.

Our customers will receive all those services and benefits from a single source at SYSTA GmbH, whether it is about electrical engineering, measurement technology, automation and telecontrol or process control engineering.

Kontakt Formular

Kontaktformular